5.06.2011
View of Community Room and covered patio deck
5.06.2011
New tube slide installed in leisure pool
5.06.2011
New stainless steel skimmer system has been installed on competition pool
5.06.2011
New entrance to pool complex from Wile Avenue
3.09.2011
Vincent Pools has resumed construction on the renovations to the competition pool. Framing has been installed to set the new gutter system and a ramp into the pool for handicapped accessibility.
3.09.2011
The new filter building is under roof and the standing seam roofing is scheduled to be installed shortly. Crews are working inside the building to install the new filters and pumps and other mechanical equipment.
3.09.2011
Moderating temperatures have been a welcome site to the pool construction project. All exterior masonry walls for the new bathhouse building are complete and the truss roof is underway by Penn Builders. Vincent Pools are preparing to install the coping around the new leisure pool and complete the piping back to the new filter building. Installation of pool decking and the new slide is scheduled for mid-April.
3.09.2011
Souderton Borough expresses deep appreciation for the generous donation of Ricks Crane Service who has donated his time and service to set the truss roof on the new bathhouse building. Over two thirds of the truss roof was set in one day thanks to his generous contribution.
11.01.10
A view of the new diving well. Penn Builders is pictured in the background excavating for the footings for the new bathhouse building.